English Page 8
D. Installation
Preparation
• Unpack the boom and the motor unit and keep it ready for mounting.
Required tools
2
1
Combination wrench SW 10
Combination wrench SW 13
Socket wrench SW 8
Socket wrench SW 10
Socket wrench SW 13
Screw driver, size 5
Screw driver, size 8
Phillips Screw driver, size 2
Masonry drill ø 6 mm
Masonry drill ø 10 mm
Metal drill ø 5 mm
Pliers
Hack saw
Electric drill
Electric drill
Attention!
Before drilling, cover the motor unit with foil or cardboard.
Drilling dust and chippings can lead to malfunctions.
Site requirements
• Please suspend the motor unit together with the boom in such a way,
that the upper door edge lies approx. 10 mm below the downward horizontal
boom edge- measured at the highest point of the opening course
(see points 8, 9 and 10).
• Mount the unit to the ceiling according to the site requirements.
Please observe as well the indicated measurements for wall plug drilling.
3