Marantec Comfort 250 Operations Instructions Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 88
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
English Page 8
D. Installation
Preparation
Unpack the boom and the motor unit and keep it ready for mounting.
Required tools
2
1
Combination wrench SW 10
Combination wrench SW 13
Socket wrench SW 8
Socket wrench SW 10
Socket wrench SW 13
Screw driver, size 5
Screw driver, size 8
Phillips Screw driver, size 2
Masonry drill ø 6 mm
Masonry drill ø 10 mm
Metal drill ø 5 mm
Pliers
Hack saw
Electric drill
Electric drill
Attention!
Before drilling, cover the motor unit with foil or cardboard.
Drilling dust and chippings can lead to malfunctions.
Site requirements
Please suspend the motor unit together with the boom in such a way,
that the upper door edge lies approx. 10 mm below the downward horizontal
boom edge- measured at the highest point of the opening course
(see points 8, 9 and 10).
Mount the unit to the ceiling according to the site requirements.
Please observe as well the indicated measurements for wall plug drilling.
3
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 87 88

Comments to this Manuals

No comments